Main ingredients: new cement floor should be smooth, stable. Curing in 30 more days and moisture content is below 8%; clear the impurities; polishing skid parts.
Properties: |
epoxy resin series |
Application: |
Terrace and others |
Classification: |
Terrace paint |
New concrete contains much moisture. Wet concrete must have long time for curing before coating to reduce moisture content.
Old concrete is contaminated by grease, acid, alkali and other chemical materials. Some of ground surface are coated to show old paint film; some of them are broken to fix.
Other methods can be taken, such as machine abrasive blasting
2. Suitable for surface treatment of new concrete ground to get rid of grease, dirt and old paint film.
3. Grinding and digging.
This method is mainly used for the surface with heavy oil contamination; after treatment, patching materials are fixed to the surface.
4. Machine polishing
can get rid of floating liquid and loosen substance on the concrete. Use recoating treatment of ole paint film; adopt power-driven grinding wheel to grind roughness on old paint film.
5. Wire brush polishing
adopt manual or motor wire brush to polish and get rid of loosen substances on the concrete.
6. Impact tools:
adopt staple gun or other impact tool to made concrete surface rough.
Treatment standard
Performance |
Test method |
Light application environment |
Medium application environment |
Surface tensile elasticity |
|
≥1.4mpa |
≥2.1mpa |
Surface roughness |
Objective test |
150 mesh sand paper for finest |
150 mesh sand paper for finest |
Surface clearness |
Visible dust |
No obvious dust |
No obvious dust |
Surface evenness |
2m running rule |
≤2mm |
≤2mm |
Residual substance |
Water drip 3 |
00 contact angle |
00 contact angle |
PH value |
ASRND4262 |
6-8 |
6-8 |
Moisture ratio |
Moisture tester |
≤6 |
≤6 |